altra
 
Testimonial
 

 

My wife and I have been most impressed with the remodeling project Mike and his competent team completed on our master bathroom.
Mike proved to be a very creative master craftsman. He listened carefully to my wife's ideas, and made excellent suggestions. We wanted our shower enclosureto be glass, but not see-through. Mike suggested a wide horizontal glass etching with clear glass above and below on the shower enclosure,which offered privacy,yet maintained a visually spacial quality with a clear view of the unique shower floor of flat rock composition. A very pleasing combination.
 
Mike's estimates of cost and time for the remodeling were very accurate and well documented. Mike had several contractors and suppliers, and he coordinated their operations very carefully so that no time was wasted, and costs were kept minimum. He only used high quality sub-contractors; and he carefully explained operations of some of the unique fixtures so that we have had no problems.
 
Mike's preparation of our house entrances and floors for transport of bathroom articles and construction materials to be installed was exceptional; so that no damage to floors and walls could occur. He carefully cleaned all areas, inside and outside, afterward to leave no unnecessary trace of the remodeling work. The bathroom was left perfectly clean and sparkling; and Mike returned to check for assurances that we had no questions or problems with fixtures, He takes pride in his craft; and his team was quite efficient, cordial, and careful in their efforts.
 
We have had multiple moves, and in some situations, house repairs or renovations; and we have never worked with a better remodeling or renovating company. Mike was constantly giving us good advice about fixtures, remodeling techniques, and unique layouts such as an efficiently placed shower bench with easy access to all showerfixtures. Remodeling and renovations can be difficult, invasive and unpleasant. Mike made the experience as pleasant and as undisturbed as possible. We have never had abetter experience in such situations.
 
Dick and Pat Lawrence     
   2011 Bathroom Projects (Before and after photos)
   
Main » Search Results » Project Details
  
Customer: Mr. & mrs Schaaf

Project Description: Kitchen remodel. (Complete) Cost to complete Kitchen, half bath, entry, laundry room, and 2 dining rooms 54,000.00. Testimonial:
MHM Remodeling was recommended to us by a granite contractor. We called Mike Stathos, checked his website, were impressed with the pictures of his work and also learned one of our neighbors had used Mike's services to remodel her master bath. She gave him a 5 star recommendation, So we met and hired Mike to, first, remodel our guest bathroom and if we liked it, then we would consider including the master bath/dressing room and kitchen areas. We have lived in our home since 1981 and this was our first major renovation, so knew we needed someone who was experienced and flexible enough to handle unexpected structural challenges as well as providing us with new facilities with a definite "WOW" factor. Mike promised that he and Nate would be here on time every day, work diligently, clean up daily and stay on our job full time and continuously until finished to our satisfaction. And they did! Mike is a perfectionist and demands the same high standards of his sub-contractors: cabinetry, granite, tile and floor installers. The guest bathroom was completed first-rate and definitely sold us on continuing with MHM. In fact, we added all the other areas, plus the foyer, half-bath, breakfast and laundry rooms to the list. The new master bath includes one of the classiest new walk-in showers you will ever see. We weren't sure to what extent we wanted our kitchen remodeled. Mike suggested options and improvements, led us through our doubts and produced a beautiful result. Check the granite rainforest counter tops,back splashes and beautiful new custom-built cabinets in the picture section. Wow! Mike is an expert plumber, electrician and carpenter - he does it all! He rebuilt our substandard bath floors and walls before adding his touch for a gorgeous result. He removed a wall and raised a ceiling to open the kitchen. We are very pleased. Everyone involved in our project, which took more than three months, was professional and provided us top quality work. If you want a confident, proficient professional, call Mike Stathos and give him the opportunity to make you happy with your remodeling project.

Jerry and Judy Schaaf
Austin

Kitchen before

New kitchen

Kitchen before

New fridge placement

Wall to be removed

Dining room before

New kitchen with open concept

Back view of new kitchen

New kitchen with open concept

Entryway before

New walnut entry floor

New 1/2 bathroom

New hand scraped walnut floor

New rain forest granite

New undermount kitchen sink
 
Contact Form
 

Please fill out the form to receive information about our products and services.

Enter the code shown above
Submit
Home  |  Testimonials  | Register | Login
Copyright 2008 by mhmremodeling.com   |  Privacy Statement  |  Terms Of Use  Design by webzoneus.com