 |
|
"Words can never express the depth of my appreciation for the phenomenal job done by Mike in our master shower remodel and second bath retiling. He provided detailed bids, shared meticulous records, informed me during each phase of the projects, completed the jobs on time, and did an amazing transformation in the two rooms at a reasonable price. His work ethic and integrity restored my faith as I had been burned by another remodeler in the past. I'd hire Mike again in a heartbeat. I've told others of his professionalism and highly recommend his services."
Austin, TX
|
|
|
 |
|
 |
|
 |
2010 Projects
|
 |
| |
|
|
| |
J. Carr
Bathroom remodel slated to start 10-25-2010
|
| |
| |
| |
| |
| |
|
| |
James Carr Hall Bathroom renovation
Cost to complete project $ 8,200.00 Full small bathroom renovation. Testimonial : "Mike masterfully turned what once was a forgotten, unfinished bathroom into a sparkling little gem of a room. His skill and experience took my vision and turn it into a reality. He had to work within a tight time frame, with a tight budget, and in a very tight space and faced challenge after challenge head on. Mike’s attention to detail during every phase of the project, from conception to cleanup, is unparalleled. The result of his craftsmanship is a crisp, sparkly, happy little bathroom that pictures can not capture."
D. Carr
Austin, TX
|
| |
|
| |
James Carr
Cost to complete project $24,890.00 Full master bathroom remodel. Testimonial: "One of the principle reasons we hired MHM Remodeling was the confidence that Mike would do the work himself and that he knew what he was doing. Mike and his helper, Nathan, displayed an exemplary work ethic by being on time, staying late when required and always working hard.
Mike’s choice of vendors helped us keep the final tally close to his estimate while not sacrificing quality. In fact, we were impressed with how accurate his labor and materials estimate actually was. He was a sounding board for our ideas, told us what was feasible, what was practical, and what would break the budget. He expressed his opinion, was forthright with his answers to our questions, and above all, he was honest.
The finished bathroom is so stunning that no one would know that the project was plagued with challenges from Day One. The obstacles came from existing framing, to incorrect supplies, and, occasionally, an owner with “new ideas”. Mike overcame each problem as it was encountered. His meticulous attention to detail, his experience, and his skilled craftsmanship enabled him to produce a quality product that expertly blended form and function.
Mike takes pride in his work. It is refreshing to find a business owner who is accountable for the work he does and who cares about satisfying his customer. We highly recommend MHM Remodeling and we look forward to working with Mike again in the future."
J.Carr
|
| |
|
| |
The Boettcher's
Cost to complete project $ 11,310.52. 6'x6' custom shower renovation Time to complete job 3 weeks.Testimonial: Our Master Bathroom is a wonderful sanctuary, but our huge walk-in shower was an eyesore. After some setbacks due to our shower being out of square, Mike transformed it from a builder-grade white box to a masterpiece which we're proud to show off! He does beautiful work and is very conscientious. Thanks Mike!
Pam B.
|
| |
|
| |
Jenny Goddard
Cost to complete project 13,650.00. Master bathroom renovation time to complete job 3 weeks.Testimonial: I called MHM Remodeling because my master bathroom needed a facelift. The shower was too cramped and there was not enough cabinet space. MHM Remodeling really opened up my bathroom. They were able to make the square footage seem a lot bigger. The guys were very nice and easy to communicate with about my ideas for the remodel. They were clean and respectful of my home. My new shower is great!
Thanks!
Jenny Goddard
|
| |
|
| |
Mr. Plourde jack -n- jill bathroom renovation
Cost to complete project: $11,200.00 and time to complete project 2 weeks. Testimonial :“Since Mike did such a nice job remodeling my master bathroom last year (2009), I knew I would hire him again when I was ready to remodel the upstairs Jack-n-Jill bathroom. He and Nate did a nice job and finished well ahead of schedule! I plan to use Mike again when I’m ready to remodel the kitchen and half bath. Thanks again!”
|
| |
|
|
|
|
|
|
|
|
|
|
 |