altra
 
Testimonial
 

“M.H.M Remodeling renovated our entire home and
Remodeled both of our bathrooms. They have done various
Job’s since then and each time the results were fantastic.
Mike was on time and worked well with my schedule.
We didn’t even have to move out while the renovation
was in progress."

Neil E.
Round Rock TX

   2010 Bathroom Projects (Before and after photos)
   
Main » Search Results » Project Details
  
Customer: Wendy Hobbs

Project Description: master bathroom renovation. (Cost to complete $ 19,230.00) I must say this is the best tile selection of 2010 hands down. Great job Wendy! Testimonial: Master Bath Remodel Testimonial:

My master bath is GORGEOUS! I had previously chosen completely different floor and wall tile, and changed my mind as Mike was finishing my boys’ bathroom. (See review below.) He was instrumental in helping me select the tile, and then went above and beyond when we found out how difficult it was going to be to install resin-backed white onyx. Mike researched the material and found just the right backing and grout to turn a stack of tile into the most amazing bathroom I’ve ever seen. I trust Mike 110%. How many of you reading this review have felt that way about a contractor? He figures out how to do things the best way possible, and then he does it. Every single day I walk into my master bathroom and am thankful that I found him. If I had installed the tile I had originally purchased, I know I wouldn’t have liked it. Now my 33-yr-old bathroom looks like a Roman Spa, and there isn’t a single thing that I wish I had done differently. As I said on my previous review, if you are anxious about picking a contractor, put your trust in Mike. He does all the work himself, and he knows what he is doing. You will not be disappointed in your results. Best wishes to you!
~Wendy Hobbs, Austin, TX

c. After white onyx bathroom tile

b. before

d. before

e. After white onyx bathroom tile

f. entry before

g. entry after

h. before

i. onyx floor tile after

j. before window

k. After window

l. before slanted ceiling

m. After straight ceiling

n. floor close up

o. close up tub to tile detail

p. close up low light
 
Contact Form
 

Please fill out the form to receive information about our products and services.

Enter the code shown above
Submit
Home  |  Testimonials  | Register | Login
Copyright 2008 by mhmremodeling.com   |  Privacy Statement  |  Terms Of Use  Design by webzoneus.com